33KV cable terminations inside gas insulated switchgear

Sector: Oil & Gas

ZOHR E&I Phase III

33KV GIS cable termination and testing, E&I cable laying, transformer oil filling and filtration, and E&I commissioning.

Client
Petrobel / ENI
Main contractor
Petrojet
Location
Port Said, Egypt
Year
2024

Project overview

Electrical and instrumentation works for phase 3 of the ZOHR development project in Port Said, from February 2024 to January 2026. The client was Eni / Petrobel, with Petrojet as main contractor.

The scope included special 33KV cable terminations and testing for the gas insulated switchgear (GIS), using plug-in socket type 3 Connex termination kits, along with electrical and instrumentation cable laying.

The team also carried out oil filling and filtration for the power transformers, removing moisture, gases and particles from the insulating oil to restore its dielectric strength, and supported E&I commissioning and operation of the facility.

10 photos

  • 33KV GIS termination kits prepared on site
  • Technicians preparing 33KV cable terminations
  • Open GIS bay with installed cable terminations
  • Close-up of a 33KV plug-in termination kit
  • Power cables laid in parallel along a cable tray
  • Long cable rack carrying power and instrument cables
  • Cable trays branching across a pipe rack
  • Insulating oil tester display showing test results
  • Transformer oil filtration unit on site
  • Technician testing instrumentation during commissioning